In Hangar Happenings # 2, I talked about the beginnings of the construction on the new bathroom. Here are some updates to the amazing new bathroom!
The original bathroom access was walled up to make a new wall for one toilet stall.
| The original door to the bathroom is now covered. |
| Leopold adding a wall between the Sentinel shower and the new bathroom |
After the walls were put up, Leopold placed new tiles.
The walls were plastered and painted.
| Matthew placing plaster on the concrete. |
| Matthew setting up the ceiling fan/light. |
For a new sink, Kevin found an old rusted Craftsman tool cabinet. Matthew removed the bottom drawers and cut a hole for a sink.
Kevin painted it a shiny new red color.Matthew found someone to put in new cabinet doors.
Matthew even came up with the cool idea to use old sockets for handles!
| Finished product |
Kevin is in the process of welding the doors and Wane will paint them. We will soon have an amazing bathroom!